e-Shuttle Service Use Procedures

To use the e-Shuttle service, take the following procedures.

Advance
Preparation
1 Please contact our shuttle service sales partner or FML sales person in charge.
iPlease notice delivery date when you place an order because it takes three to five months to prototype your die.)
2 Make various advance preparations (NDA contract, EULA contract, FTP account registration)
3 Accept related documents.
Reservation
and order of
shuttle service
4 Design your circuit.
5 Send "Reservation Application" to e-Shuttle Inc.
6 The shuttle run reservation is fixed(block position, delivery shape, etc.)
7 Send "Option Confirmation" to e-Shuttle Inc.
8 Reservation is confirmed and prototyping conditions are fixed.
Design ended 9 Send GDS data to e-Shuttle Inc.
Production 10 The production of the die is started.
Product
delivery
11 The die is finished. (Work Period: Three to Five Months) (Accept Device Process Monitor Measurement Data.j
e-Shuttle Service Use Procedures

Materials to be sent

  • GDS data Please snd GDS data without error after confirming that there is no error
  • Release Check Sheet: Please fill in a format which we provide and send it back to us.
  • DRC Check Summary File: Please send DRCcheck results with GDS data.
  • GDR Check Summary File: Please send GDR check results with GDS data.
    i*Please send ERC, LVS, or ANTENNA summary file if requiredj

Deliberables from e-Shuttle Inc.

  • No. of die delivered: 30 pcs (Minimum Gurnateed Quantity)
  • ProceeMonitor Check Results

Notice on e-Shuttle Service Usage

Basically, we would not provide any function IP for shuttle service. Therefore, if you require a functio IP, you should obtain the function IP and mount the IP to your circuit design.

Moreover, we would not guarantee the operation of a die we provide through our shuttle service.